Overview
I need an excel sheet to estimate the cost of the following using the cost unit method:
- Provide labor, material and equipment to install patient safety system infrastructure at first floor
and to install power over ethernet cabling at the locations of the patient fall monitoring system AVASURE
1. 1st Floor - Add (24) locations
2. 2nd Floor - Add (6) locations
3. 3rd Floor - Add (6) locations
4. Add power circuits as required in room 3124, extend to circuit in room
5. Add data outlets as required in room 3124
Wanderguard
1. Add (7) delayed egress to existing door
a. (4) Key card reader locations
b. (4) duplex outlets for controller power
c. (1) duplex outlet for repeater power
3. Add (1) dupex outlet for repeater
4. Add the following at the doors 1100, S4-1A, C1-7A, C1-6A, S3-1A
a. (1) Key card reader locations
b. (1) duplex outlets for controller power