Hi,
I have three phases projects for HVAC that already done which are:
✅ phase 1 for heating load
✅ phase 2 cooling load
✅ phase 3 duct size
INSTRUCTIONS
Note: do not just copy and paste all three phases and combine them without go through the requirement pdf.
That’s it.