OnlineNursingOwl
← All nursing posts

Environmental Science · Studypool

ENV 4301-20.01.00-FA23L-S1, Pollution Prevention

Under the eighth level 1 (centered, bold) heading titled Engineering Opportunities for Pollution Prevention, consider your constructed table of available pollution prevention (P2) control technology options for each ecosystem disturbance from the Unit VI work. Now, carefully select at least one control technology to apply as an appropriate P2 technique for each industry sector’s identified ecosystem disturbance.

  1. As you compare your previously tabulated total maximum daily load (TMDL) limits from the Unit II work, describe how each P2 control technique will be expected to affect the facility’s effluent permit TMDL limits for each considered ecosystem disturbance. If you find that it is more appropriate to select more than one P2 technique for a given ecosystem disturbance, you are encouraged to do so.
  2. Be sure and create at least one paragraph for each industry sector represented within each of the scenario applications (natural gas well, confined animal feed operations of CAFO lagoons and carcass pits, gypsum and caliche open pit excavation mines, corn and alfalfa fields, and the feed mill). You may find it convenient to use a level 2 heading (left-justified, bold) to keep these scenario applications separated for discussion within your document