please use microsoft project
Deliverable 2: Project Scope & Time ManagementProject Scope Management
Tasks:
- Draft a scope statement based on stakeholder needs.
- Define and document a detailed project and product description.
- Create a Work Breakdown Structure (WBS) with at least 4 levels, reflecting both traditional and agile components.
- Verify scope and formalize acceptance criteria.
- Define a scope change management plan incorporating agile sprint reviews and backlog refinement.
Project Time Management
Tasks:
- Define, sequence, and estimate activities, resources, and durations.
- Create a hybrid Gantt Chart (MS Project or GanttProject) showing milestones, dependencies, and critical path.
- Explicitly identify schedule slack (total and free).
- Document the WBS and schedule in MS Project or GanttProject.
- Add Agile sprint cycles or iterations in parallel with the traditional plan.
Assessment Formatting Guidelines
Word Count
- Maximum: 3,000 words (excluding title page, references, and appendices).
Document Structure
- Title Page: Include assessment title, your name, student ID, course/module name, and date.
- Table of Contents: Include if required.
- Main Body: Organize using clear headings and subheadings.
- Conclusion: Summarize key points and findings.
- References: Full reference list in APA style.
- Appendices: Optional; use only for supporting materials.
Formatting Style
- Font: Times New Roman or Arial.
- Font Size: 12 pt for body text, 14 pt bold for main headings.
- Line Spacing: 1.5 throughout (single spacing for reference list).
- Margins: 2.5 cm (1 inch) on all sides.
- Alignment: Justified text.
- Page Numbers: Bottom-right corner, starting from the introduction page.
Referencing
- Use APA Style.
- All in-text citations must match the reference list.
- Reference list should begin on a new page.
Figures and Tables
- Label all figures and tables (e.g., Figure 1: Title, Table 1: Title).
- Place as close as possible to the relevant text.
- Always cite the source if not original.
Rubric
Linked CLOs:
- CLO 2 (Deliverables)
- CLO 4 (Critical path/time management)
- CLO 1 (Organizational factors)
| Criteria | A (90–100) | A-, B+, B (80–89) | B-, C+, C (70–79) | C-, D+, D (60–69) | F (0–59) | Linked CLOs |
|---|---|---|---|---|---|---|
| Scope Statement & Description (10%) | Scope is comprehensive, precise, and validated with stakeholders; includes detailed acceptance criteria and aligns with organizational/cultural context. Demonstrates deep critical thinking about stakeholder conflicts and scope creep. | Scope is clear and structured, includes most details and acceptance criteria, but minor weaknesses in validation or alignment. | Basic scope provided, limited detail or vague acceptance criteria. | Weak scope statement; fails to reflect actual stakeholder needs. | Missing or irrelevant. | CLO 2 |
| Work Breakdown Structure (WBS) (30%) | WBS is highly detailed with 4+ levels, integrates both traditional and Agile elements (e.g., sprints, backlog items). Logical hierarchy with deliverables, tasks, and subtasks that demonstrate understanding of hybrid PM. | WBS is clear with 4 levels, mostly logical, some attempt to include Agile. | WBS is adequate but shallow, missing Agile or logical flow. | Minimal or inconsistent WBS with missing levels. | No WBS. | CLO 2 |
| Schedule (Gantt, Dependencies, Slack, Critical Path) (30%) | Schedule is comprehensive: hybrid Gantt chart shows milestones, dependencies, critical path, total/free slack, Agile sprints alongside waterfall phases. Demonstrates mastery of scheduling tools. | Good Gantt chart, clear dependencies, includes milestones, some attempt to show slack or Agile cycles. | Adequate schedule but lacks critical path analysis, slack, or Agile components. | Minimal schedule, poorly sequenced. | No schedule submitted. | CLO 4 |
| Scope Change Management Plan (30%) | Highly detailed change management plan: incorporates Agile sprint reviews, backlog refinement, stakeholder approval processes. Anticipates risks of scope creep and offers solutions. | Clear change plan with Agile elements, but not fully detailed. | Some scope change process mentioned, but weak or limited to traditional approach. | Minimal and unclear plan. | No change management approach. | CLO 1, CLO 2, CLO 4 |
I will provide more hint and answer to follow.