OnlineNursingOwl
← All nursing posts

Management · Studypool

Management Question

Overview

In Module 1 you chose a project and completed a Project Charter. Now you will develop a Work Breakdown Structure (WBS) for that project with four to five (4-5) high level tasks and an average of four to five (4-5) sub-tasks for each high level task.

You must have a minimum of 20 tasks. Note: It is not necessary to have an equal number of sub-tasks for each high level task, but you are required to have a minimum of 20 tasks in total. Download and save the WBS Template. Download WBS Template (Attached). The template has two tabs - one for the Graphical WBS and one for the WBS Dictionary. Note: You may use a design of your own choosing, but it must contain both the Graphical WBS and the WBS Dictionary.

  1. On the Graphical WBS tab, enter the identified high-level tasks and sub-tasks. Be sure to include:
    • Task Name
    • WBS Code
  2. On the WBS Dictionary tab, based on your identified tasks, create your WBS Dictionary. Be sure to include:
    • Level
    • WBS Code
    • Task Name
    • Definition

Please refer to the Work Breakdown Structure Rubric for guidance about completing this assignment.

Submit your Work Breakdown Structure to this Assignment.