Overview
Chapter 14, End of Chapter Problems 14.3 A, B and C, and 14.5 A , B
- Be sure to show all of your calculations in your submission.
Problem 14.3 is worth 50 points and 14.5 is worth 30 points.
Submit your assignment in the form of a Word or an Excel file.
- Design a product structure noting the quantities for each item and show the low-level coding.
- Determine the gross quantities needed of each item if you are to assemble 50 brackets.
- Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock. PX
- •• 14.5 The demand for subassembly S is 100 units in week 7. Each unit of S requires 1 unit of T and 2 units of U. Each unit of T requires 1 unit of V, 2 units of W, and 1 unit of X. Finally, each unit of U requires 2 units of Y and 3 units of Z. One firm manufactures all items. It takes 2 weeks to make S, 1 week to make T, 2 weeks to make U, 2 weeks to make V, 3 weeks to make W, 1 week to make X, 2 weeks to make Y, and 1 week to make Z.
- Construct a product structure. Identify all levels, parents, and components.
- Prepare a time-phased product structure.